State Route RT O N North-BARTON COUNTY- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins.028 MILE(S) AFTER CRD SW 60TH RD E.
Scheduled from07-JUN-2024to17-SEP-2024.
State Route RT O S South-BARTON COUNTY- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins.02 MILE(S) AFTER CRD SW 15TH RD E.
Scheduled from07-JUN-2024to17-SEP-2024.
Loop LP 49 N North-BATES COUNTY- Road Closed
BRIDGE MAINTENANCE
Road closure begins.012 MILE(S) AFTER CRD NE 6004 E.
Scheduled from29-MAY-2024to28-JUN-2024.
Loop LP 49 S South-BATES COUNTY- Road Closed
BRIDGE MAINTENANCE
Road closure begins.011 MILE(S) AFTER CRD NW 6002 E.
Scheduled from29-MAY-2024to28-JUN-2024.
CRD KASTENDIECK RD E East-CHRISTIAN COUNTY- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins.001 MILE(S) AFTER CRD LAMBETH RD S.
Scheduled from24-MAR-2024to01-JUL-2024.
CRD KASTENDIECK RD W West-CHRISTIAN COUNTY- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure beginsCRD VERMULE RD S.
Scheduled from24-MAR-2024to01-JUL-2024.
CRD VERMULE RD N North-CHRISTIAN COUNTY- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure beginsCRD KASTENDIECK RD E.
Scheduled from19-MAR-2024to01-JUL-2024.
CRD VERMULE RD S South-CHRISTIAN COUNTY- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins.02 MILE(S) AFTER MO 14 E.
Scheduled from19-MAR-2024to01-JUL-2024.
State Route RT K E East-DADE COUNTY- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins.012 MILE(S) BEFORE CRD 181 S.
Scheduled from18-MAR-2024to15-JUL-2024.
State Route RT K W West-DADE COUNTY- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins.007 MILE(S) BEFORE CRD 189 S.
Scheduled from18-MAR-2024to15-JUL-2024.
CRD 205 N North-GREENE COUNTY- Road Closed
MEDIAN OR SHOULDER
Road closure beginsUS 60 E.
Scheduled from29-FEB-2024to31-AUG-2024.
CRD 205 S South-GREENE COUNTY- Road Closed
MEDIAN OR SHOULDER
Road closure begins.001 MILE(S) AFTER US 60 W.
Scheduled from29-FEB-2024to31-AUG-2024.
CRD 213 N North-GREENE COUNTY- Road Closed
MEDIAN OR SHOULDER
Road closure beginsUS 60 E.
Scheduled from29-FEB-2024to31-AUG-2024.
CRD 213 S South-GREENE COUNTY- Road Closed
MEDIAN OR SHOULDER
Road closure begins.001 MILE(S) AFTER US 60 W.
Scheduled from29-FEB-2024to31-AUG-2024.
CRD 219 N North-GREENE COUNTY- Road Closed
MEDIAN OR SHOULDER
Road closure beginsUS 60 E.
Scheduled from29-FEB-2024to31-AUG-2024.
CRD 219 S South-GREENE COUNTY- Road Closed
MEDIAN OR SHOULDER
Road closure beginsUS 60 W.
Scheduled from29-FEB-2024to31-AUG-2024.
CRD 223 N North-GREENE COUNTY- Road Closed
MEDIAN OR SHOULDER
Road closure beginsUS 60 E.
Scheduled from29-FEB-2024to31-AUG-2024.
CRD 223 S South-GREENE COUNTY- Road Closed
MEDIAN OR SHOULDER
Road closure begins.002 MILE(S) AFTER US 60 W.
Scheduled from29-FEB-2024to31-AUG-2024.
CRD 241 N North-GREENE COUNTY- Road Closed
MEDIAN OR SHOULDER
Road closure begins.001 MILE(S) AFTER US 60 E.
Scheduled from29-FEB-2024to31-AUG-2024.
CRD 241 S South-GREENE COUNTY- Road Closed
MEDIAN OR SHOULDER
Road closure beginsUS 60 W.
Scheduled from29-FEB-2024to31-AUG-2024.
CRD 94 E East-GREENE COUNTY- Road Closed
INTERSECTION IMPROVEMENTS
Road closure beginsUS 65 S.
Scheduled from10-JUN-2024to04-NOV-2024.
CRD 94 W West-GREENE COUNTY- Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins.001 MILE(S) AFTER US 65 N.
Scheduled from10-JUN-2024to04-NOV-2024.
CRD HARMONY AVE N North-GREENE COUNTY- Road Closed
MEDIAN OR SHOULDER
Road closure begins.002 MILE(S) AFTER US 60 E.
Scheduled from01-MAR-2024to31-AUG-2024.
CRD HARMONY AVE S South-GREENE COUNTY- Road Closed
MEDIAN OR SHOULDER
Road closure begins.002 MILE(S) AFTER US 60 W.
Scheduled from01-MAR-2024to31-AUG-2024.
State Route MO 125 N North-GREENE COUNTY- Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins.027 MILE(S) AFTER CRD 182 E.
Scheduled from28-MAY-2024to15-AUG-2024.
State Route MO 125 N North-GREENE COUNTY- Road Closed
MEDIAN OR SHOULDER
Road closure begins.001 MILE(S) AFTER US 60 E.
Scheduled from29-FEB-2024to31-AUG-2024.
State Route MO 125 S South-GREENE COUNTY- Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins.006 MILE(S) AFTER CST NW OUTER RD E.
Scheduled from28-MAY-2024to15-AUG-2024.
State Route MO 125 S South-GREENE COUNTY- Road Closed
MEDIAN OR SHOULDER
Road closure beginsUS 60 W.
Scheduled from29-FEB-2024to31-AUG-2024.
Ramp RP US65N TO US60E E East-GREENE COUNTY- Road Closed
PAVEMENT REPAIR
Road closure beginsUS 65 N.
Scheduled from19-JUN-2024to28-JUN-2024.
State Route RT PP N North-GREENE COUNTY- Road Closed
Project Name -I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins.001 MILE(S) AFTER RT K S.
Scheduled from16-MAY-2024to26-OCT-2024.
State Route RT PP S South-GREENE COUNTY- Road Closed
Project Name -I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure beginsRT K S.
Scheduled from16-MAY-2024to26-OCT-2024.
State Route RT V N North-GREENE COUNTY- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins.437 MILE(S) AFTER CRD 33 S.
Scheduled from17-JUN-2024to09-SEP-2024.
State Route RT V S South-GREENE COUNTY- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins.445 MILE(S) AFTER PVT 38 E.
Scheduled from17-JUN-2024to09-SEP-2024.
State Route MO 39 N North-LAWRENCE COUNTY- Road Closed
Project Name -I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins.013 MILE(S) AFTER CRD 2160 E.
Scheduled from06-MAY-2024to28-SEP-2024.
State Route MO 39 N North-LAWRENCE COUNTY- Road Closed
Project Name -I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins.014 MILE(S) AFTER CRD 2100 E.
Scheduled from18-MAR-2024to13-JUL-2024.
State Route MO 39 S South-LAWRENCE COUNTY- Road Closed
Project Name -I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins.025 MILE(S) AFTER CRD 2154 E.
Scheduled from06-MAY-2024to28-SEP-2024.
State Route MO 39 S South-LAWRENCE COUNTY- Road Closed
Project Name -I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins.012 MILE(S) AFTER RT OO E.
Scheduled from18-MAR-2024to13-JUL-2024.
State Route RT C W West-MCDONALD COUNTY- Road Closed
BRIDGE RECONSTRUCTION
Road closure beginsRT CC E.
Scheduled from13-MAY-2024to31-AUG-2024.
State Route MO 82 E East-ST. CLAIR COUNTY- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins.006 MILE(S) AFTER OR 82 E.
Scheduled from28-MAY-2024to30-AUG-2024.
State Route MO 82 W West-ST. CLAIR COUNTY- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins.013 MILE(S) AFTER CRD SE 150 E.
Scheduled from28-MAY-2024to30-AUG-2024.
State Route RT W N North-WEBSTER COUNTY- Road Closed
Project Name -I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins.027 MILE(S) AFTER RT Y E.
Scheduled from03-JUN-2024to27-SEP-2024.
State Route RT W S South-WEBSTER COUNTY- Road Closed
Project Name -I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins.033 MILE(S) AFTER RT EE E.
Scheduled from03-JUN-2024to27-SEP-2024.
State Route MO 86 E East-BARRY COUNTY- Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 08-JUL-2024.
Road work begins.042 MILE(S) BEFORE MO 76 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of06:00 AMand06:00 PM.
State Route RT F E East-BARRY COUNTY- Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 08-JUL-2024.
Road work beginsMO 112 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of06:00 AMand06:00 PM.
State Route RT F W West-BARRY COUNTY- Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 08-JUL-2024.
Road work beginsMO 86 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of06:00 AMand06:00 PM.
Interstate IS 49 N North-BATES COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-MAR-2024 to 30-JUL-2024.
Road work begins.29 MILE(S) BEFORE RR NEVADA SUB S.
Work will be done 7 days a week.
Interstate IS 49 S South-BATES COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-MAR-2024 to 30-JUL-2024.
Road work begins.309 MILE(S) BEFORE LP 49 S.
Work will be done 7 days a week.
State Route MO 7 N North-BENTON COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAY-2024 to 28-JUN-2024.
Road work begins.436 MILE(S) AFTER CRD CREE ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of06:00 AMand06:00 PM.
State Route MO 7 S South-BENTON COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAY-2024 to 28-JUN-2024.
Road work begins.002 MILE(S) BEFORE CRD LICKINGTELLER AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of06:00 AMand06:00 PM.
PVT ENGLISH VILLAGE DR E East-CHRISTIAN COUNTY- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins.002 MILE(S) AFTER CRD N DEFFER DR S.
Work will be done on weekdays only.
PVT ENGLISH VILLAGE DR W West-CHRISTIAN COUNTY- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work beginsUS 160 E.
Work will be done on weekdays only.
State Route RT AA E East-CHRISTIAN COUNTY- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins.002 MILE(S) AFTER PVT BRISTOL LN S.
Work will be done on weekdays only.
State Route RT AA W West-CHRISTIAN COUNTY- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins.001 MILE(S) BEFORE US 160 E.
Work will be done on weekdays only.
State Route RT CC E East-CHRISTIAN COUNTY- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work beginsUS 160 E.
Work will be done on weekdays only.
State Route RT CC W West-CHRISTIAN COUNTY- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins.002 MILE(S) AFTER CRD SYCAMORE RD E.
Work will be done on weekdays only.
US US 60 W West-CHRISTIAN COUNTY- Expect Delays
SHOULDER WORK
Scheduled from 10-JUN-2024 to 01-JUL-2024.
Road work begins.001 MILE(S) AFTER CRD STAIGER RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand07:00 PM.
US US 60 W West-CHRISTIAN COUNTY- Expect Delays
SHOULDER WORK
Scheduled from 10-JUN-2024 to 31-AUG-2024.
Road work begins.001 MILE(S) AFTER CRD LAMBETH RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand07:00 PM.
US US 65 N North-CHRISTIAN COUNTY- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins.023 MILE(S) BEFORE RT F E.
Work will be done on weekdays only.
Work will be conducted between the hours of06:00 AMand04:00 PM.
US US 65 N North-CHRISTIAN COUNTY- Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAR-2024 to 03-MAR-2025.
Road work begins.009 MILE(S) AFTER RT F W.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 PMand06:00 AM.
US US 65 S South-CHRISTIAN COUNTY- Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAR-2024 to 03-MAR-2025.
Road work begins.115 MILE(S) BEFORE RP US65S TO MO14 S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 PMand06:00 AM.
US US 65 S South-CHRISTIAN COUNTY- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins.011 MILE(S) BEFORE RT CC E.
Work will be done on weekdays only.
Work will be conducted between the hours of06:00 AMand04:00 PM.
US US 160 W West-CHRISTIAN COUNTY- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins.147 MILE(S) BEFORE RT AA E.
Work will be done 7 days a week.
State Route MO 73 N North-DALLAS COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-JUN-2024 to 30-JUL-2024.
Road work beginsUS 65 S.
Work will be done on weekdays only.
Work will be conducted between the hours of06:30 AMand06:30 PM.
State Route RT M E East-DALLAS COUNTY- Delays Possible
Project Name -I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 03-JUN-2024 to 26-JUL-2024.
Road work begins.378 MILE(S) BEFORE CRD JONES CREEK RD E.
Work will be done on weekdays only.
CST CAMPBELL AVE N North-GREENE COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 30-MAY-2024 to 07-JUL-2024.
Road work begins.001 MILE(S) AFTER CST E EL CAMINO ALTO E.
Work will be done 7 days a week.
CST CAMPBELL AVE S South-GREENE COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 30-MAY-2024 to 07-JUL-2024.
Road work begins.003 MILE(S) AFTER CST REPUBLIC ST E.
Work will be done 7 days a week.
CST GLENSTONE AVE N North-GREENE COUNTY- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-FEB-2023 to 28-JUN-2024.
Road work begins.002 MILE(S) BEFORE CST REPUBLIC CT E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
CST GLENSTONE AVE S South-GREENE COUNTY- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-FEB-2023 to 28-JUN-2024.
Road work begins.003 MILE(S) AFTER RP IS44E TO LP44W W.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
Interstate IS 44 E East-GREENE COUNTY- Expect Delays
Project Name -I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 18-MAY-2024 to 30-AUG-2024.
Road work begins1.021 MILE(S) BEFORE RP IS44E TO RTPP S.
Work will be done 7 days a week.
Work will be conducted between the hours of07:00 PMand07:00 AM.
Interstate IS 44 W West-GREENE COUNTY- Expect Delays
Project Name -I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 18-MAY-2024 to 30-AUG-2024.
Road work begins.558 MILE(S) BEFORE RP IS44W TO RTK N.
Work will be done 7 days a week.
Work will be conducted between the hours of07:00 PMand07:00 AM.
State Route MO 125 N North-GREENE COUNTY- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins.004 MILE(S) AFTER CRD 186 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand03:00 PM.
State Route MO 125 S South-GREENE COUNTY- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins.044 MILE(S) AFTER CRD 170 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand03:00 PM.
State Route MO 13 N North-GREENE COUNTY- Expect Delays
SHOULDER WORK
Scheduled from 11-DEC-2023 to 01-NOV-2024.
Road work begins.021 MILE(S) BEFORE RP US60W TO MO13S S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand05:00 PM.
State Route MO 13 S South-GREENE COUNTY- Expect Delays
SHOULDER WORK
Scheduled from 11-DEC-2023 to 01-NOV-2024.
Road work begins.229 MILE(S) BEFORE OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand05:00 PM.
State Route MO 174 W West-GREENE COUNTY- Expect Delays
ROADSIDE WORK
Scheduled from 06-MAY-2024 to 01-JUL-2024.
Road work beginsUS 60 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand07:00 PM.
State Route MO 744 E East-GREENE COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUN-2024 to 31-JUL-2025.
Road work beginsUS 160 W.
Work will be done on weekdays only.
Work will be conducted between the hours of06:00 AMand06:00 PM.
State Route MO 744 W West-GREENE COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUN-2024 to 31-JUL-2025.
Road work begins.001 MILE(S) AFTER RT OO E.
Work will be done on weekdays only.
Work will be conducted between the hours of06:00 AMand06:00 PM.
State Route RT B N North-GREENE COUNTY- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 03-JUN-2024 to 15-AUG-2024.
Road work beginsRT MM S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route RT B S South-GREENE COUNTY- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 03-JUN-2024 to 15-AUG-2024.
Road work begins.022 MILE(S) BEFORE OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route RT MM N North-GREENE COUNTY- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 03-JUN-2024 to 15-AUG-2024.
Road work begins.067 MILE(S) BEFORE CRD 140 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route RT MM S South-GREENE COUNTY- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 03-JUN-2024 to 15-AUG-2024.
Road work beginsRT B S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route RT ZZ N North-GREENE COUNTY- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 19-SEP-2023 to 01-NOV-2024.
Road work begins.005 MILE(S) AFTER CRD 186 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route RT ZZ S South-GREENE COUNTY- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 19-SEP-2023 to 01-NOV-2024.
Road work begins.01 MILE(S) AFTER CST HINES ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
US US 160 E East-GREENE COUNTY- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAR-2023 to 01-DEC-2024.
Road work begins.218 MILE(S) BEFORE RP US60E TO KANSAS EXPY S S.
Work will be done 7 days a week.
US US 160 W West-GREENE COUNTY- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAR-2023 to 01-DEC-2024.
Road work begins.087 MILE(S) AFTER US 60 W.
Work will be done 7 days a week.
US US 60 E East-GREENE COUNTY- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins.013 MILE(S) AFTER CRD 205 S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand03:00 PM.
US US 60 E East-GREENE COUNTY- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-SEP-2023 to 01-DEC-2024.
Road work begins.073 MILE(S) BEFORE US 160 E.
Work will be done 7 days a week.
US US 60 W West-GREENE COUNTY- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 01-MAY-2024 to 01-JUL-2024.
Road work begins.001 MILE(S) AFTER CST O NEAL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand07:00 PM.
US US 60 W West-GREENE COUNTY- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-SEP-2023 to 01-DEC-2024.
Road work begins.086 MILE(S) BEFORE RP BU65 TO US60W W.
Work will be done 7 days a week.
US US 60 W West-GREENE COUNTY- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins.012 MILE(S) BEFORE RT B S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand03:00 PM.
US US 65 N North-GREENE COUNTY- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUN-2024 to 04-NOV-2024.
Road work begins.003 MILE(S) BEFORE CRD 94 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
US US 65 N North-GREENE COUNTY- Expect Delays
PAVEMENT STRIPING
Scheduled from 28-MAY-2024 to 22-JUL-2024.
Road work beginsCST TIMBERCREST ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand07:00 AM.
US US 65 S South-GREENE COUNTY- Expect Delays
PAVEMENT STRIPING
Scheduled from 28-MAY-2024 to 22-JUL-2024.
Road work begins.003 MILE(S) BEFORE CRD VALLEY WATER MILL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand07:00 AM.
Interstate IS 44 E East-GREENE COUNTY- Delays Possible
Project Name -I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 20-MAY-2024 to 27-SEP-2024.
Road work begins.034 MILE(S) BEFORE RP IS44E TO RTPP S.
Work will be done 7 days a week.
Interstate IS 44 W West-GREENE COUNTY- Delays Possible
Project Name -I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 20-MAY-2024 to 27-SEP-2024.
Road work begins.016 MILE(S) AFTER RP IS44W TO RTK N.
Work will be done 7 days a week.
US US 160 E East-GREENE COUNTY- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins.014 MILE(S) AFTER CRD 182 E.
Work will be done 7 days a week.
State Route MO 13 S South-HENRY COUNTY- Delays Possible
SHOULDER WORK
Scheduled from 11-JUN-2024 to 01-JUL-2024.
Road work begins.004 MILE(S) AFTER CST ANTIOCH DR S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of08:00 AMand05:00 PM.
Interstate IS 49 S South-JASPER COUNTY- Expect Delays
PAVEMENT STRIPING
Scheduled from 28-MAY-2024 to 22-JUL-2024.
Road work beginsIS 44 W.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand07:00 AM.
Interstate IS 49 S South-JASPER COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 16-JUN-2024 to 22-JUN-2024.
Road work begins.007 MILE(S) BEFORE CRD CIVIL WAR RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand07:00 PM.
Interstate IS 49 S South-JASPER COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 16-JUN-2024 to 22-JUN-2024.
Road work begins.032 MILE(S) BEFORE RT D E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand07:00 PM.
State Route RT HH E East-JASPER COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-JUN-2024 to 18-JUL-2024.
Road work beginsCST MAIN ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Outer Road W OR 49 S South-JASPER COUNTY- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work beginsRT HH E.
Work will be done on weekdays only.
Ramp RP IS49S TO RTHH W West-JASPER COUNTY- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work beginsIS 49 S.
Work will be done on weekdays only.
Ramp RP RTHH TO IS49S S South-JASPER COUNTY- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work beginsRT HH E.
Work will be done on weekdays only.
State Route RT HH E East-JASPER COUNTY- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins.044 MILE(S) BEFORE OR 49 S.
Work will be done on weekdays only.
State Route RT HH W West-JASPER COUNTY- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins.011 MILE(S) AFTER IS 49 S.
Work will be done on weekdays only.
CST ODELL ST E East-LAWRENCE COUNTY- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-FEB-2024 to 01-JUL-2024.
Road work begins.001 MILE(S) AFTER CST ASH ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand07:00 PM.
CST ODELL ST W West-LAWRENCE COUNTY- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-FEB-2024 to 01-JUL-2024.
Road work begins.002 MILE(S) AFTER CST FRISCO ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand07:00 PM.
State Route RT H N North-LAWRENCE COUNTY- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-JUL-2023 to 01-NOV-2024.
Road work begins.031 MILE(S) BEFORE CST 1ST ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route RT H S South-LAWRENCE COUNTY- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-JUL-2023 to 01-NOV-2024.
Road work begins.096 MILE(S) BEFORE CST 5TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
US US 60 E East-LAWRENCE COUNTY- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 01-MAY-2024 to 01-JUL-2024.
Road work beginsCST CENTRAL AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand07:00 PM.
US US 60 E East-LAWRENCE COUNTY- Expect Delays
SHOULDER WORK
Scheduled from 10-JUN-2024 to 01-JUL-2024.
Road work beginsMO 14 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand07:00 PM.
State Route MO 43 N North-MCDONALD COUNTY- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-JUN-2024 to 08-AUG-2024.
Road work begins.001 MILE(S) BEFORE RT PP E.
Work will be done on weekdays only.
Work will be conducted between the hours of06:00 AMand06:00 PM.
State Route MO 43 S South-MCDONALD COUNTY- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-JUN-2024 to 08-AUG-2024.
Road work beginsPVT BRIDGE J509 S.
Work will be done on weekdays only.
Work will be conducted between the hours of06:00 AMand06:00 PM.
State Route MO 90 E East-MCDONALD COUNTY- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-JUN-2024 to 08-JUL-2024.
Road work begins.001 MILE(S) AFTER CST WATER ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of06:00 AMand06:00 PM.
State Route MO 90 W West-MCDONALD COUNTY- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-JUN-2024 to 08-JUL-2024.
Road work begins.001 MILE(S) AFTER CST RAILROAD ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of06:00 AMand06:00 PM.
Interstate IS 44 E East-NEWTON COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-JUN-2024 to 30-NOV-2024.
Road work beginsRP IS44E TO MO43 S.
Work will be done 7 days a week.
Work will be conducted between the hours of07:00 PMand07:00 AM.
Interstate IS 44 E East-NEWTON COUNTY- Expect Delays
PAVEMENT STRIPING
Scheduled from 28-MAY-2024 to 22-JUL-2024.
Road work begins.176 MILE(S) BEFORE RP IS44E TO US166 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand07:00 AM.
Interstate IS 44 W West-NEWTON COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-JUN-2024 to 30-NOV-2024.
Road work begins.016 MILE(S) AFTER RP LP49S TO IS44W W.
Work will be done 7 days a week.
Interstate IS 49 N North-NEWTON COUNTY- Expect Delays
PAVEMENT STRIPING
Scheduled from 28-MAY-2024 to 22-JUL-2024.
Road work begins.008 MILE(S) AFTER MO 175 S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand07:00 AM.
State Route RT HH E East-NEWTON COUNTY- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 05-JUN-2024 to 28-JUN-2024.
Road work begins.014 MILE(S) AFTER CST KENTLAND DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:30 PM.
US US 60 E East-NEWTON COUNTY- Expect Delays
PAVEMENT REPAIR
Scheduled from 17-JUN-2024 to 01-AUG-2024.
Road work begins.001 MILE(S) AFTER CRD KODIAK RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand07:00 AM.
US US 60 W West-NEWTON COUNTY- Expect Delays
PAVEMENT REPAIR
Scheduled from 17-JUN-2024 to 01-AUG-2024.
Road work beginsMO 59 S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand07:00 AM.
State Route RT BB E East-POLK COUNTY- Expect Delays
PAVEMENT REPAIR
Scheduled from 20-JUN-2024 to 27-JUN-2024.
Road work begins.187 MILE(S) BEFORE CRD 422ND RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:30 PM.
State Route RT BB W West-POLK COUNTY- Expect Delays
PAVEMENT REPAIR
Scheduled from 20-JUN-2024 to 27-JUN-2024.
Road work beginsMO 13 N.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:30 PM.
State Route RT O N North-POLK COUNTY- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-MAY-2024 to 08-JUL-2024.
Road work begins.012 MILE(S) AFTER RT V E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand07:00 PM.
State Route RT O S South-POLK COUNTY- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-MAY-2024 to 08-JUL-2024.
Road work begins.036 MILE(S) BEFORE CST NORTH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand07:00 PM.
State Route MO 13 N North-STONE COUNTY- Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 08-JUL-2024.
Road work beginsCST BLUE EYE BLVD S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand07:00 AM.
State Route MO 13 S South-STONE COUNTY- Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 08-JUL-2024.
Road work begins.128 MILE(S) BEFORE PVT PARADISE LANDING RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand07:00 AM.
State Route MO 265 N North-STONE COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 15-MAY-2024 to 28-JUN-2024.
Road work begins.073 MILE(S) BEFORE CRD COMPTON RIDGE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand06:00 AM.
State Route MO 265 S South-STONE COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 15-MAY-2024 to 28-JUN-2024.
Road work begins.004 MILE(S) AFTER MO 76 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand06:00 AM.
State Route MO 376 E East-TANEY COUNTY- Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 08-JUL-2024.
Road work beginsCST SHEPHERD OF THE HILLS EXP E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand07:00 AM.
State Route MO 376 W West-TANEY COUNTY- Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 08-JUL-2024.
Road work beginsMO 265 S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand07:00 AM.
State Route MO 76 E East-TANEY COUNTY- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 03-JUN-2024 to 20-SEP-2024.
Road work beginsCRD HARP LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand07:00 AM.
State Route MO 76 W West-TANEY COUNTY- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 03-JUN-2024 to 20-SEP-2024.
Road work begins.053 MILE(S) AFTER CRD MANDOLIN DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand07:00 AM.
State Route MO 86 E East-TANEY COUNTY- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 03-APR-2024 to 01-JUL-2024.
Road work begins.488 MILE(S) BEFORE CRD JONES RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand06:00 PM.
State Route MO 86 E East-TANEY COUNTY- Expect Delays
Project Name -Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 27-DEC-2024.
Road work begins.163 MILE(S) AFTER CRD LEISURE LN E.
Work will be done 7 days a week.
Project Web Page -https://www.modot.org/long-creek-bridge-project
State Route MO 86 W West-TANEY COUNTY- Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 08-JUL-2024.
Road work beginsUS 65 N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of06:00 AMand06:00 PM.
State Route MO 86 W West-TANEY COUNTY- Expect Delays
Project Name -Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 27-DEC-2024.
Road work begins.218 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done 7 days a week.
Project Web Page -https://www.modot.org/long-creek-bridge-project
State Route MO 86 W West-TANEY COUNTY- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 03-APR-2024 to 01-JUL-2024.
Road work beginsUS 65 N.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand06:00 PM.
US US 65 N North-TANEY COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-JUN-2024 to 27-JUN-2024.
Road work begins.077 MILE(S) BEFORE PVT BUFFALO RIDGE BLVD E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand06:00 AM.
State Route MO 86 E East-TANEY COUNTY- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins.174 MILE(S) AFTER CRD LEISURE LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand06:00 PM.
State Route MO 86 W West-TANEY COUNTY- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins.194 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand06:00 PM.
US US 54 E East-VERNON COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 20-MAY-2024 to 01-NOV-2024.
Road work begins.018 MILE(S) AFTER CRD 1200 S.
Work will be done 7 days a week.
US US 54 W West-VERNON COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 20-MAY-2024 to 01-NOV-2024.
Road work begins.031 MILE(S) AFTER CRD 1375 S.
Work will be done 7 days a week.
Interstate IS 44 E East-WEBSTER COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 17-JUN-2024 to 05-JUL-2024.
Road work begins.09 MILE(S) AFTER CRD PLANK SCHOOL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand07:00 AM.
State Route RT K E East-BARTON COUNTY- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 01-DEC-2024.
Road work begins.012 MILE(S) AFTER CRD NW 150TH LN S.
Work will be done 7 days a week.
State Route RT K W West-BARTON COUNTY- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 01-DEC-2024.
Road work begins.011 MILE(S) AFTER CRD NW 145TH LN S.
Work will be done 7 days a week.
CRD LAMBETH RD N North-CHRISTIAN COUNTY- CLOSED
RAILROAD MAINTENANCE
Scheduled from 24-JUN-2024 to 08-JUL-2024.
Road work begins.006 MILE(S) AFTER US 60 E.
Work will be done 7 days a week.
CRD LAMBETH RD S South-CHRISTIAN COUNTY- CLOSED
RAILROAD MAINTENANCE
Scheduled from 24-JUN-2024 to 08-JUL-2024.
Road work beginsCRD KASTENDIECK RD E.
Work will be done 7 days a week.
State Route MO 14 E East-CHRISTIAN COUNTY- CLOSED
PAVEMENT REPAIR
Scheduled from 24-JUN-2024 to 01-JUL-2024.
Road work beginsUS 60 E.
Work will be done on weekdays only.
State Route MO 14 W West-CHRISTIAN COUNTY- CLOSED
PAVEMENT REPAIR
Scheduled from 24-JUN-2024 to 01-JUL-2024.
Road work begins.001 MILE(S) AFTER CST PINE ST S.
Work will be done on weekdays only.
State Route MO 14 W West-CHRISTIAN COUNTY- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 24-JUN-2024 to 27-JUN-2024.
Road work begins.044 MILE(S) AFTER PVT HICKMAN LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand04:00 PM.
Outer Road W OR 65 N North-DALLAS COUNTY- No Delays Expected
PAVEMENT REPAIR
Scheduled from 25-JUN-2024 to 28-JUN-2024.
Road work begins.478 MILE(S) BEFORE CRD RED TOP RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:00 PM.
Outer Road W OR 65 S South-DALLAS COUNTY- No Delays Expected
PAVEMENT REPAIR
Scheduled from 25-JUN-2024 to 28-JUN-2024.
Road work begins.024 MILE(S) AFTER CRD RED TOP RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:00 PM.
State Route RT AA E East-DALLAS COUNTY- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 25-JUN-2024 to 27-JUN-2024.
Road work beginsUS 65 S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:00 PM.
CST SCHOOLCRAFT FWY S South-GREENE COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 23-JUN-2024 to 29-JUN-2024.
Road work begins.008 MILE(S) BEFORE BU 65 N.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand07:00 AM.
Interstate IS 44 E East-GREENE COUNTY- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 30-JUN-2024 to 10-JUL-2024.
Road work begins.206 MILE(S) AFTER CST GRANT AVE S.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of10:00 PMand06:00 AM.
Interstate IS 44 W West-GREENE COUNTY- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 30-JUN-2024 to 10-JUL-2024.
Road work begins.562 MILE(S) BEFORE CST GRANT AVE S.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of10:00 PMand06:00 AM.
State Route RT C E East-GREENE COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-JUN-2024 to 02-JUL-2024.
Road work beginsUS 65 S.
Work will be done on weekdays only.
Work will be conducted between the hours of06:30 AMand06:30 PM.
State Route RT C W West-GREENE COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-JUN-2024 to 02-JUL-2024.
Road work beginsMO 125 S.
Work will be done on weekdays only.
Work will be conducted between the hours of06:30 AMand06:30 PM.
State Route RT UU N North-GREENE COUNTY- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 26-JUN-2024 to 27-JUN-2024.
Road work begins.016 MILE(S) BEFORE CRD RTUU TO CRD94 S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:00 PM.
US US 160 E East-GREENE COUNTY- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 27-JUN-2024 to 27-JUN-2024.
Road work begins.062 MILE(S) AFTER CRD BRAYFIELD DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:00 PM.
US US 65 N North-GREENE COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 23-JUN-2024 to 29-JUN-2024.
Road work begins.012 MILE(S) BEFORE BU 65 S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand07:00 AM.
State Route MO 7 N North-HENRY COUNTY- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 12-JUL-2024.
Road work begins.093 MILE(S) AFTER RT O S.
Work will be done on weekdays only.
Work will be conducted between the hours of06:00 AMand06:00 PM.
State Route MO 7 S South-HENRY COUNTY- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 12-JUL-2024.
Road work begins.096 MILE(S) AFTER RT DD S.
Work will be done on weekdays only.
Work will be conducted between the hours of06:00 AMand06:00 PM.
State Route RT W N North-HICKORY COUNTY- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 24-JUN-2024 to 27-JUN-2024.
Road work beginsRT B S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:30 AMand04:00 PM.
State Route RT W S South-HICKORY COUNTY- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 24-JUN-2024 to 27-JUN-2024.
Road work begins.021 MILE(S) AFTER PVT PRIVATE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:30 AMand04:00 PM.
Interstate IS 49 N North-JASPER COUNTY- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 25-JUN-2024 to 27-JUN-2024.
Road work begins1.337 MILE(S) BEFORE RP IS49N TO RTH E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand05:00 PM.
Interstate IS 49 S South-JASPER COUNTY- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 25-JUN-2024 to 27-JUN-2024.
Road work begins.12 MILE(S) BEFORE RT H E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand05:00 PM.
State Route MO 171 N North-JASPER COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 23-JUN-2024 to 29-JUN-2024.
Road work begins.02 MILE(S) BEFORE PED RUBY JACK TRAIL E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand07:00 PM.
CRD 2175 E East-LAWRENCE COUNTY- CLOSED
RAILROAD MAINTENANCE
Scheduled from 24-JUN-2024 to 08-JUL-2024.
Road work beginsCRD POINSETTA RD S.
Work will be done 7 days a week.
CRD 2175 W West-LAWRENCE COUNTY- CLOSED
RAILROAD MAINTENANCE
Scheduled from 24-JUN-2024 to 08-JUL-2024.
Road work beginsUS 60 E.
Work will be done 7 days a week.
CST ODELL ST E East-LAWRENCE COUNTY- CLOSED
RAILROAD MAINTENANCE
Scheduled from 24-JUN-2024 to 08-JUL-2024.
Road work beginsCST ASH ST S.
Work will be done 7 days a week.
CST ODELL ST W West-LAWRENCE COUNTY- CLOSED
RAILROAD MAINTENANCE
Scheduled from 24-JUN-2024 to 08-JUL-2024.
Road work begins.001 MILE(S) AFTER CST FRISCO ST S.
Work will be done 7 days a week.
State Route RT H N North-LAWRENCE COUNTY- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-JUN-2024 to 27-JUN-2024.
Road work begins.001 MILE(S) AFTER CRD 2220 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand03:30 PM.
State Route RT AB N North-POLK COUNTY- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 24-JUN-2024 to 26-JUN-2024.
Road work begins.551 MILE(S) BEFORE CRD S 212TH RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand04:00 PM.
State Route RT F N North-POLK COUNTY- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 25-JUN-2024 to 26-JUN-2024.
Road work beginsMO 215 S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:30 PM.
State Route RT F S South-POLK COUNTY- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 25-JUN-2024 to 26-JUN-2024.
Road work begins.007 MILE(S) AFTER RT KK E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:30 PM.
State Route RT K N North-POLK COUNTY- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 25-JUN-2024 to 26-JUN-2024.
Road work begins.355 MILE(S) BEFORE CRD 559TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:30 PM.
State Route RT K S South-POLK COUNTY- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 25-JUN-2024 to 26-JUN-2024.
Road work beginsMO 215 S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:30 PM.
State Route RT Y E East-POLK COUNTY- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 25-JUN-2024 to 26-JUN-2024.
Road work begins.012 MILE(S) BEFORE MO 13 N.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:30 PM.
State Route RT Y W West-POLK COUNTY- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 25-JUN-2024 to 26-JUN-2024.
Road work beginsCRD 480TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:30 PM.
State Route RT Z E East-POLK COUNTY- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 26-JUN-2024 to 26-JUN-2024.
Road work beginsRT H S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:30 PM.
State Route RT Z W West-POLK COUNTY- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 26-JUN-2024 to 26-JUN-2024.
Road work beginsCRD 525TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:30 PM.
State Route MO 76 E East-TANEY COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-JUN-2024 to 05-JUL-2024.
Road work begins.065 MILE(S) BEFORE CRD LAKE SHORE DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand06:00 AM.
State Route MO 76 W West-TANEY COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-JUN-2024 to 05-JUL-2024.
Road work begins.057 MILE(S) BEFORE CRD WALKINGTON LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand06:00 AM.
US US 160 E East-TANEY COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-JUN-2024 to 05-JUL-2024.
Road work begins.148 MILE(S) BEFORE CRD SILVER CREEK RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand06:00 AM.
US US 160 W West-TANEY COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-JUN-2024 to 05-JUL-2024.
Road work begins.066 MILE(S) BEFORE CRD SIOUX LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 PMand06:00 AM.
State Route RT AA W West-WEBSTER COUNTY- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 25-JUN-2024 to 27-JUN-2024.
Road work beginsMO 38 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:00 PM.
State Route RT P E East-WEBSTER COUNTY- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-JUN-2024 to 25-JUN-2024.
Road work begins.213 MILE(S) AFTER CRD ROUGH COUNTRY RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route RT P W West-WEBSTER COUNTY- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-JUN-2024 to 25-JUN-2024.
Road work begins.01 MILE(S) AFTER RT C S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route RT Y E East-WEBSTER COUNTY- Delays Possible
CULVERT REPLACEMENT
Scheduled from 24-JUN-2024 to 24-JUN-2024.
Road work begins.88 MILE(S) AFTER CRD ST LUKE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:00 PM.
State Route RT Y W West-WEBSTER COUNTY- Delays Possible
CULVERT REPLACEMENT
Scheduled from 24-JUN-2024 to 24-JUN-2024.
Road work begins.042 MILE(S) AFTER CRD WILLOW LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:00 PM.